Skip to content

Tioga Pass in Yosemite Opens Thursday, June 29

Yosemite's Tioga Pass in late June, 2017.
Yosemite's Tioga Pass Road opens June 29

Milky Way from Tioga Pass Road 10:32 pm June 21, 2017.

Yosemite News Release
June 27, 2017 4:00 pm
For Immediate Release

Tioga Road in Yosemite National Park Open to All Vehicular Traffic Thursday, June 29, 2017

Tioga Road will open for Bicycle and Pedestrian Use on Wednesday, June 28, 2017

The Tioga Road in Yosemite National Park (Highway 120 through the park) will open for the season to all vehicular traffic beginning at 8:00 am on Thursday, June 29, 2017. There will be limited visitor services available from the Tioga Pass Entrance Station to Crane Flat. Tioga Road will open for bicycle and pedestrian users at 8:00 am Wednesday, June 28, 2017.

All visitors on the road are encouraged to use caution as there may be dirt, debris, and water flowing over sections of the road. Visitors are encouraged to keep an eye out for maintenance vehicles working on the roadway.

Tioga Pass is Open! by Jeff Sullivan

Tioga Pass June 2017

There will be minimal services available along the Tioga Road for several weeks. There will be no drinking water. Visitors should use the vault and portable toilets located along the roadway to help protect water quality in the Tuolumne River watershed. Food service and lodging are not available along the Tioga Road. There is no mobile phone service at this time and 911 emergency calls will not be operational. There are no gasoline services available along Tioga Road. Visitors can purchase gasoline in Lee Vining and at Crane Flat.

For maps and visitor information, visit the Tuolumne Meadows Wilderness Center, open from 8:30 am to 4:30 pm, the Big Oak Flat Information Station, the Yosemite Valley Visitor Center, and the Mono Basin Scenic Area Visitor Center in Lee Vining.

Tamarack Flat Campground is the only campground that is currently open along Tioga Road. This campground is first-come, first served and fills early in the day.

Evening Reflection on Tioga Pass, June 2017Anyone planning to hike or backpack near Tuolumne Meadows and in all high elevation areas of Yosemite should be prepared for winter hiking and camping conditions. Trails are still impacted by snow and ice. River crossings are high and swift moving. There are several high water areas currently impacting the Pacific Crest Trail (PCT) and the John Muir Trail (JMT) in Yosemite National Park. Trail conditions may vary at any time.

When driving in the park, motorists are urged to drive slowly as bears and other animals are active and may be present on the roadway.

For updated 24-hour road and weather conditions for Yosemite National Park, please call 209-372-0200 and press 1.

https://activesole.blogspot.com/2017/06/tioga-road-in-yosemite-national-park-to.html

Snow Melting on Tioga Pass

Comments

5 thoughts on “Tioga Pass in Yosemite Opens Thursday, June 29”

  1. とても美しい風景を、ありがとうございます🎶
    日にちや時間はわかりませんが、
    貴方が、健やかで楽しい毎日を過ごせますように、願います。
    心から感謝しています💕

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Loading Facebook Comments ...